IBM i Modernization Software

Will my RPG or COBOL applications run on Power 10 or Power 11 after a Power 9 migration?

Yes, in almost every case. RPG and COBOL are core to IBM i's backward compatibility model, and IBM has kept application continuity across Power generations a deliberate design commitment since the AS/400 launch. A well-planned migration from Power 9 moves your RPG and COBOL programs, and the Db2 for i data underneath them, to Power 10 or Power 11 without recompiling or rewriting the application logic.

Answer

The part that actually needs attention is the IBM i operating system release, not the application code. Each Power generation supports a minimum IBM i release, so if your Power 9 partition is running an older release, the migration plan may need to include an OS upgrade before or during the hardware move. Third-party integrations pinned to a specific PTF level or Java runtime are the other place to check, since those are more likely to need revalidation than the RPG or COBOL source itself.

Back to IBM i Modernization Software